This project was carried out as part of a BIM process using Revit and consisted of the construction of a two-storey, 4,000 m2 building including:
- Administrative offices, meeting and interview rooms, multifunctional space, multimedia library, and training rooms equipped with all the necessary IT equipment
- An armoury
- A vast training and gathering area accessible to military vehicles
- A secured space for document archiving
- Two cafeterias
- A storage area
- A fenced parking area
The structure integrated long span engineered timber within a steel framework. Several energy efficiency measures were implemented, which allowed for reducing the overall building energy consumption by more than 52% compared to the National Energy Code for Buildings (NECB).