The construction of the Mirabel aquatic centre marks a significant milestone in the development of the City’s community infrastructure. Built near the new Du Maréchal high school, it creates a genuine hub for sports, education and community life at the heart of the Saint-Augustin neighbourhood. The building’s modern facilities are designed to meet the needs of families and residents as well as those of athletes, sports clubs and the educational community.
A delivery model that prioritizes collaboration
CIMA+’s structural engineering team was engaged to oversee the construction of this new multi-purpose centre under a design-build contract, alongside contractor Magil Construction. This is one of the first major public projects to be carried out using this delivery model, an approach that encourages close collaboration between the design and construction teams from the earliest stages of a project.
The two-storey steel-framed building has a floor area of approximately 3,200 m². It includes a 25-metre competition pool with 10 lanes, and 1-metre and 3-metre diving boards, a leisure pool with 4 lanes, water play areas and a slide, as well as changing rooms, multi-purpose rooms, offices, a sports club, mechanical rooms, spectator stands, a lifeguard room and two indoor pools. These varied spaces enable the centre to host a wide range of activities, from recreational swimming and athletic training to lessons, competitions and community events.
Overcoming structural challenges with tailored solutions
In terms of structural engineering, several design choices played a key role in the building’s performance and durability. The significant variation in the terrain was leveraged to transform the basement into a garden-level area at the rear of the building, optimizing the centre’s integration into its surroundings. The cross-laminated timber roof, supported by steel trusses, meets the requirements for the long spans that are typical of aquatic spaces, while helping to create a warm and distinctive interior environment.
The foundations on driven piles, meanwhile, provide a robust base suited to the site conditions.
Beyond its function as a sports facility, the aquatic centre represents a sustainable investment in the quality of life of local residents. It offers an accessible, inclusive and safe space where residents can learn, train, socialize and adopt healthy lifestyles. Thanks to our experts in structural engineering, CIMA+ has left an indelible mark on the creation of this essential public facility, designed to support Mirabel’s growth and meet the needs of its community for years to come.