Wasaga Beach is home to the world’s longest freshwater beach and one of Ontario’s most popular urban provincial parks, attracting residents and visitors to its recreational trails, campgrounds and summer festivals. Effective wastewater treatment is therefore essential to protecting the community and its natural environment.
The Wasaga Beach Water Pollution Control Plant (WPCP) improvements span four projects, with the first two now complete.
Project 1: Filtration upgrades for better performance
Two of the WPCP’s four aging deep bed sand filters were replaced with compact, low-headloss Veolia Hydrotech disk filters. The existing filter chambers were retrofitted to accommodate the new tertiary disk filters. The two remaining sand filters were retained for redundancy. Due to high variability in disk filter models, a vendor pre-selection process was conducted by CIMA+ early in the project to ensure proper fit and performance.
Project 2: Renewing critical disinfection infrastructure
The WPCP’s previous UV disinfection system, installed in the 1990s, had reached the end of its service life and spare parts were no longer available. A larger capacity Trojan[AF3.1] UV system was installed to meet the projected peak flow capacity of 46,000 m3/d.
Housed entirely in a below-grade channel within the Tertiary Filtration Building, the new UV system was carefully selected to fit within existing hydraulic and structural constraints, avoiding the need for major channel modifications. A temporary bypass UV system was used to maintain continuous effluent disinfection during construction.
Project 3: Enhanced screening and ventilation in Inlet Building
The two existing bar screens, installed in the 1990s, have 12 mm spacing and allow excessive solids to pass into the downstream process, impairing aeration efficiency and increasing maintenance requirements. As well, their peak flow capacity of 38,189 m³/day is insufficient for projected future loads. CIMA+ evaluated alternatives to replace the screens, given constructability constraints. A pre-selection process was conducted to determine the preferred screen type according to site constraints, performance requirements and overall implementation cost. The replacement involves expanding the existing screen channels to accommodate new 6 mm opening screens with a hydraulic capacity of 46,000 m3/d.
The HVAC system was also upgraded to include two independent air handling systems: one for the building itself and one for the wastewater channels that is connected to new odour control units. This design reduces the spread of corrosive and noxious gases in the building, reducing odour, corrosion of piping and equipment, and improving working conditions for operators.
Project 4: Expanding standby power capacity and reliability
The WPCP’s existing 470 kW standby generator, installed as part of the 1998 plant upgrade, provides emergency power to essential process loads during utility outages. A 2022 OCWA study found that, after accounting for upgrades to the Aerobic Biosolids Complex and additional loads from the Thickening Building, the generator would operate at approximately 75% to 80% of its capacity. As a result, it has limited capacity to support future plant expansion or supply non-essential loads.
Following an evaluation of two upgrade alternatives, the preferred solution was to install a new outdoor 500-kW diesel standby generator and retrofit the existing main switchgear. The new generator will operate concurrently with the existing 470 kW indoor generator, improving standby power reliability and enabling both essential and non-essential plant loads to remain operational during utility power outages. This solution also provides additional standby capacity to support future plant upgrades.
Delivering integrated, high-performance wastewater treatment upgrades
In all, these upgrades have provided OCWA and the Town of Wasaga Beach with more sustainable, efficient and reliable wastewater treatment infrastructure capable of supporting future community growth, and both the Town and province’s environmental protection objectives.