CIMA+ was tasked with designing overhead and underground distribution lines and calculating pole, down guy and anchor strength, voltage drop and cable pull. The project involved replacing and relocating poles with up to 4 circuit (~11 km) with equipment such as transformers, underground risers, interrupter switches, etc. Engineering services for this project were delivered in six separate phases.
Close coordination with communication companies and street lighting designers to facilitate third party joint utility installations.