Creation of vegetated retention basins for Le Plateau de la ...
January 10, 2025
Gatineau’s vegetated retention basin project represents an innovative ecological initiative, designed to meet stormwater man ...
Rainbow Road Expansion Project
January 3, 2025
This project consisted of upgrading a 1.8 km segment of Rainbow Road located in the City of Chestermere, Alberta, from a two ...
Fibre-to-the-home (FTTH) network for the D’Autray Regional...
December 19, 2024
Detailed engineering for the design and supervision of the construction of a new municipal fibre-optic network
Communication and security systems upgrade at the Highland C...
December 16, 2024
The existing HCTP communication and security infrastructure was comprised of a mix of legacy systems—such as a Nortel PBX ph ...
Infrastructure [+], Wastewater
Facility Plan and Conceptual Design of the Elmira Wastewater...
December 6, 2024
CIMA+’s proposed upgrades to improve the long-term reliability of the plant will increase the facility’s climate resilienc ...
Intelligent mobility systems [+], Operational Technologies and Solutions, Project direction, Smart Cities, Systems, software and data management, Telecommunications, Traffic management and control, Transportation
Preemption software system for fire safety
November 19, 2024
Carried out in collaboration with the City of Trois-Rivières, the project optimizes fire service responsiveness by means of a ...
Bridges and tunnels [+], Civil engineering, Climate Change and Sustainable Development, Engineering, Highways and roads, Intelligent mobility systems, Mobility and transit, Traffic management and control, Transportation
Major repairs to the Pie-IX Bridge located within the Route ...
November 11, 2024
Approximately 56,000 vehicles traverse the Pie-IX Bridge every day, making it a vital transportation link within the Route 125 ...
Trona mine processing of soda ash and sodium bicarbonate
November 5, 2024
Online cutover of multiple control systems to a consolidated DCS with zero process disruptions. The new controllers and I/O we ...
Roundabout Construction at Junction of Highways 37 and 44
November 4, 2024
CIMA+ was tasked by Alberta Transportation and Economic Corridors (TEC) to design a roundabout at the high-collision intersect ...
Development of the Intelligent Mobility Strategic Plan for T...
November 2, 2024
CIMA+ assisted Ville de Trois-Rivières in developing its first Intelligent Mobility Strategic Plan.
Civil engineering [+], Climate Change and Sustainable Development, Highways and roads, Infrastructure, Transportation
Spruce Grove to Stony Plain Trail Connection
October 9, 2024
The Town of Stony Plain, in collaboration with the City of Spruce Grove, was looking to promote alternative transportation by ...
Buildings [+], Civil engineering, Electrical engineering, Energy and Power, Engineering, Industry and Resources, Infrastructure, Mechanical engineering, Structural engineering, Testing and Commissioning
Installation of a Balance Chamber at the Atwater Water Plant...
September 12, 2024
The new hydraulic balance chamber will enable safely operation of the ozonation facility at the Atwater Water Treatment Plant, ...