Electrical substations are critical components in the power transmission and distribution system. They provide either a voltage boost to transmit power over long distances or a voltage reduction to meet the needs of end users.
A partner for your substation design and construction.
At CIMA+, we have over 40 years of proven experience in substation design and construction serving public utility companies, private developers, contractors, manufacturers, and industrial clients.
Our experts have contributed to hundreds of projects involving the design of transmission, distribution and power generating substations, AC/DC converters, static compensators, and numerous other projects in renewable energy. Our expertise in electrical substations includes conventional (overhead), metal-sheathed (GIS) and hybrid systems, from low-voltage to 735 kV. Our teams master the latest technology in 3D modelling (Catia, Inventor, MicroStation, Revit) and 3D scanning (drones).
The best solution for digitizing your substations
The IEC 61850 solution was developed by CIMA+ to meet clients’ growing needs for flexibility in equipment operation and maintenance. It helps reduce project costs and shorten schedules, makes facilities more adaptable and facilitates information sharing.
This solution’s concept is governed by the IEC 61850 standard and consists of installing a merging unit (MU) in a substation outside of the control building, which receives all voltage, current, state, alarm, trip, and lockout signals from the equipment. The MU generates and transmits digital information via fibre optics to the various required protection relays located in the control building. This new feature greatly improves the productivity of the engineering, implementation, testing, and maintenance phases of projects. Eighty percent (80%) of tests are carried out in our laboratory in a calm, pressure-free environment. This significantly reduces lead times and the possibility of problems occurring on site.
The digitization of substations allows to improve maintenance and management of power demand and supply, while incorporating modern equipment for communication, supervision, control, and storing valuable information. Digitization supports real-time decision-making with accurate and up-to-date information.
Take a look at our IEC 61850 leaflet
For more information, contact our IEC 61850 laboratory manager directly at the following address: Stephane.huot@cima.ca
Our expertise: facts and figures
CIMA+’s achievements span more than 30 years and speak for themselves.
Our specialized services
Rely on our multidisciplinary professionals to meet your requirements and expectations. We offer a full range of engineering services to successfully deliver your project, from start to finish.
The IEC 61850 Solution was developed by CIMA+ to meet customers’ growing needs for flexibility in equipment operation and maintenance. It helps reduce project costs and overtime, makes installations more adaptable and facilitates information sharing.
The concept is governed by the IEC 61850 standard and consists of installing a merging unit (MU) in a substation outside of the control building, which receives all voltage, current, state, alarm, trip, and lockout signals from the equipment. The MU generates and transmits digital information via fibre optics to the various required protection relays in the control building. This new feature greatly improves the productivity of the engineering, implementation, testing, and maintenance phases of projects.
Digital substations allow for better management of the power supply and demand, maintenance, and all by incorporating equipment for modern communication, supervision, control, and storing valuable information. This solution supports real-time decision-making with accurate and up-to-date information.
Discover our substation projects
Our teams have successfully completed hundreds of large-scale engineering projects.
Installation of a Balance Chamber at the Atwater Water Plant in Montréal
The City of Montréal operates seven water treatment plants that serve a total of approximately two million people. One of the plants, the Atwater Water Plant, is among the...
Kelowna Lee Terminal Station – Transformer and Ring Bus Addition
The project involved detailed engineering and coordination with the substation owner project manager, engineering team and other stakeholders, as well as a thorough assessment of the existing infrastructure. CIMA+...
Connecting Canada’s Largest Solar Farm to Alberta’s Main Grid
CIMA+ was responsible for the design and construction supervision of the park’s high voltage substation, which connects this huge solar park to Alberta’s main electric grid. The substation, called...
Hydro Innavik
This new hydropower facility is built in partnership with the Inuit-owned Pituvik Landholding Corporation who chose Innergex Renewable Energy Inc. to deliver the project. Once completed, this innovative project...
Trans Mountain Expansion Project — Joint Use Pole Replacement
CIMA+ worked in collaboration with multiple stakeholders to offer detailed of hundreds of TELUS poles across British Columbia. This collaboration implicated not only TELUS, Trans Mountain and BC Hydro...
Rehabilitation of the Hull 1-Generating Station
CIMA+ was the Owner’s Engineer, lead designer and construction manager to undertake the complete rehabilitation of the 12-MW generating station. The goal was to increase its useful life by...
Addition of two wind turbines on the Hydro-Quebec distribution network in Whapmagoostui
The CIMA+ team will carry out the detailed engineering of the collector network and the substation, considering the various electrical, civil, road and telecommunication aspects, and perform the necessary...
Preliminary design of an interconnection transmission line between Nova Scotia and New Brunswick
As part of the 345 kV interconnection project between New Brunswick Power (NB Power) and Nova Scotia Power Inc (NSPI), CIMA+ was entrusted with the overall front-end engineering.
The first...
Manitoba Hydro: Replacement of motorized disconnect switches at the Dorsey HVDC substation
The substation was in need of modernization works to prevent failures and ensure proper operation of the HVDC system, namely. Total refurbishment cost of the substation: $78M over five...
Electric Vehicle Charging Network and Station Design
This project focused on selecting suitable EV charging station sites that provide charging services between towns and cities within Yukon.
Desktop and field visits were conducted to shortlist candidate...
Comments from our experts
At CIMA+, we have designed an innovative and flexible IEC 61850 digital solution. We have a collaborative approach in order to meet the unique needs of our various clients, and we adapt our solution to the reality of each project.”
Stéphane Huot
Project Director, Energy and Resources – T&D - Electricity
CIMA+: a one-stop solution for all your engineering needs
We are proud of our multidisciplinary approach. By offering you everything under one roof, you benefit from a simplified collaborative approach to deliver projects quickly and on time.
Contact our team!
- By submitting this form, I agree to receive CIMA+’s email communications regarding news, updates and products.
- You may unsubscribe at any time. Please allow 10 business days to be removed from our mailing list.
- Please refer to our Privacy Policy on our website for more details.