Every construction project and human activity should minimize the impact on our communities and natural resources such as groundwater and surface water. Hydrogeology and hydrology are designed to protect the environment during construction. This expertise allows us to preserve water quality, conserve the resource, and mitigate the risk of contamination.
Fully Compliant Projects
Today, the world faces many water-related challenges. Natural disasters, potable water access, water management, and the protection of drinking water sources are among the issues that are difficult to control. In addition, some types of work can compromise the quality of groundwater, such as landfill projects involving drilling that may reach the water table. Economic activities, industrial facilities and quarries also have an impact on the quality of drinking water.
The CIMA+ team helps clients assess the constraints and issues of their projects to minimize their impact on the environment and people. We also handle permit applications and construction authorizations in compliance with regional regulations. Our objective is to ensure that every project we manage contributes to the development of communities and a better future.
Our Expertise: Facts and Figures
CIMA+’s achievements span over more than 30 years and speak for themselves.
Our Specialized Services
Rely on our multidisciplinary professionals to meet your requirements and expectations. We offer a full range of engineering services to successfully deliver your project, from start to finish.
- Permit and approval applications
- Drinking water quality and quantity surveys
- Contaminated site surveys
- Volume calculations
- Permit and approval applications (PTTW and EASR)
- Engineering solutions
- Surface water quality and quantity surveys
- Stormwater management
- Flood protection
- Drainage modeling
Discover our Hydrogeology and Hydrology Projects
Our teams have successfully completed hundreds of large-scale engineering projects.
Spruce Grove to Stony Plain Trail Connection
CIMA+ was retained by the Town to design and construct the new multi-use trail along the south side of Highway 16A between Veterans Boulevard and Campsite Road. This trail...
Assessment of GHG emissions from the transportation sector in the MRC Les Moulins and development of a GHG reduction strategy in planning tools.
Through the powers conferred to them by the Act respecting land use planning and development (LAU), MRCs have significant powers in terms of regional transportation planning. With regard to...
Rehabilitation of the Macdonald-Cartier Bridge structure
With more than 70,000 users per day, the Macdonald-Cartier Bridge is one of the main links connecting the cities of Gatineau and Ottawa. Crossing the Outaouais River, this interprovincial...
Exo Bus Electrification Program
CIMA+ conducted a climate resiliency analysis specific to the location of the construction of two future bus maintenance and charging garages, developed a GHG emissions inventory and provided mitigation...
GHG Inventory for the Rehabilitation of Northern Area Dams Six Mile Lake Region
In alignment with the Government of Canada’s goals in being carbon neutral by 2050, CIMA+ developed specifications for the management of GHG emissions and waste produced from all construction...
GHG Inventory for the Township of Mapleton
CIMA+ developed a comprehensive GHG inventory in accordance with the Global Protocol for Community-Scale GHG Emission Inventories (GPC) to better understand the emissions contributions of different activities within the...
New Francophone community centre in Orleans
With a planned 55,000 square feet of space, the new building will occupy the site of the existing MIFO building, which will be replaced. Spaces are designed for various...
WELL v2 and LEED v4 Design Certification Coordination for the Commercial Podium at 700 St-Jacques
The 700 Saint-Jacques Street 9 floor commercial podium will have a total area of 704,269 ft2. The future-focused innovative base building will be pursuing both the LEED v4 BD+C...
Burnhamthorpe Road West Environmental Assessment
CIMA+ was retained by the City of Mississauga to undertake a Schedule C Municipal Class Environmental Assessment (EA) study to assess and identify a preferred design to achieve the...
Environmental Assessment of Highway 404 North Collector Roads
CIMA+ was retained by the City of Markham to carry out a Class Environmental Assessment (EA) for the Highway 404 North Planning District area which extends from approximately 400 m north...
CIMA+: a One-stop Shop Solution for All Your Engineering Needs
We are proud of our multidisciplinary approach. By offering you everything under one roof, you benefit from a simplified collaborative approach to deliver projects quickly and on time.
Contact our Team!
- By submitting this form, I agree to receive CIMA+’s email communications regarding news, updates and products.
- You may unsubscribe at any time. Please allow 10 business days to be removed from our mailing list.
- Please refer to our Privacy Policy on our website for more details.