We offer a comprehensive range of engineering services to meet the diverse needs of our clients. Our team of skilled professionals specializes in Civil Engineering, Electrical Engineering, Mechanical Engineering, Structural Engineering, and Testing and Commissioning.
With our multidisciplinary approach and commitment to excellence, we deliver solutions that meet the unique requirements of each client and project.
Major repairs to the Pie-IX Bridge located within the Route 125 corridor between Laval and Montréal
In addition to ensuring the continuity of this link between Montréal and Laval, this ambitious project included the design and construction of a reserved Pie-IX BRT (Bus Rapid Transit)...
Roundabout Construction at Junction of Highways 37 and 44
On behalf of Alberta TEC, CIMA+ undertook the design of a roundabout at the junction of Highway 37 and Highway 44, near Edmonton, AB, which was part of a...
Spruce Grove to Stony Plain Trail Connection
CIMA+ was retained by the Town to design and construct the new multi-use trail along the south side of Highway 16A between Veterans Boulevard and Campsite Road. This trail...
Installation of a Balance Chamber at the Atwater Water Plant in Montréal
The City of Montréal operates seven water treatment plants that serve a total of approximately two million people. One of the plants, the Atwater Water Plant, is among the...
Improvement of the County Roads 21 and 56 Intersection in Simcoe County
In 2023, Simcoe Country undertook the conversion of the four-leg intersection of County Road 56 and County Road 21 into a roundabout to improve traffic flows on the two...
Ivy EV Charging Infrastructure
The Ivy Charging Network, owned by Hydro One and Ontario Power Generation, is Ontario’s largest, most connected fast-charger network, with 73 locations and 160 chargers across the province from...
Modernization of the Paisley Pumping Station for the City of Guelph
The City of Guelph provides municipal utility services to nearly 136,000 residents. By 2051, to meet provincial growth targets, the number of residents using municipal services is expected to...
Kelowna Lee Terminal Station – Transformer and Ring Bus Addition
The project involved detailed engineering and coordination with the substation owner project manager, engineering team and other stakeholders, as well as a thorough assessment of the existing infrastructure. CIMA+...
Reconstruction of Downtown Lindsay
The City of Kawartha Lakes undertook the revitalization of the historic downtown of Lindsay with the goal of renewing the core of the community for residents, businesses and tourists....
Modernization of the Herridge and Silverthorn Pumping Stations
Peel Region’s Water and Wastewater Master Plan identifies expansions and upgrades required in the South Peel water supply and storage system through to 2031. Future intensification is a key...