Building a data centre requires high level and varied technical expertise. Experience gathered in previous projects has allowed CIMA+ to develop a “one-stop-shop” approach in building engineering (electromechanical and structural), site development (civil and environmental), and in communication systems and information technology. This expertise is essential for ensuring that data centres are not only reliable but can meet all of the client’s needs.
Our priority: Supporting the operational requirements of our clients
Data centres and mission critical facilities are vital and can have a major impact on the organizations that depend on them.
A company’s reputation relies heavily on consistent and reliable operational performance and cannot risk either the safety of its employees or the loss of revenue due to equipment or power failure.
The “one-stop-shop” approach at CIMA+ allows access to high level and varied technical expertise in building engineering, site development, communication systems and information technology so essential for creating reliable critical mission facilities and data centres.
CIMA+ is proud to offer services in design, construction, and management for a variety of facilities that are always adapted to the needs of the client. CIMA+ is fully aware of the importance of these facilities and how any interruption of service could have a devastating effect for those relying on them. Redundancy and equipment safety is therefore a vital part and at the heart of how we approach each project.
Our expertise: facts and figures
CIMA+’s achievements span more than 30 years and speak for themselves.
Discover our projects involving data centres and mission critical facilities
Our teams have successfully completed hundreds of large-scale engineering projects.
Rehabilitation of the Macdonald-Cartier Bridge structure
With more than 70,000 users per day, the Macdonald-Cartier Bridge is one of the main links connecting the cities of Gatineau and Ottawa. Crossing the Outaouais River, this interprovincial...
Construction of Government offices for the Cree Nation of Waskaganish
The building is constructed with a wooden structure without a suspended ceiling, which limits the available options for locating electromechanical services. Electromechanical work includes HVAC systems, connecting fibre-optic cabling...
Renovation and expansion of the lion habitat
The project to renovate the lion habitat and add indoor winter quarters represented a unique opportunity for the design team to showcase its creative talents. The construction work included...
Expansion of the CHUS Research Centre
The CHUS Research Centre accommodates a scientific and technological leadership group that delivers innovation at the regional, national and international levels. The planned expansion called for the surface area...
Edmonton Laboratory Hub
With multiple small laboratory testing facilities disseminated across the Edmonton region, the services were stretched thin and inefficient. In the fall of 2017, the Alberta Health Service motioned the...
Paul Kane High School Replacement
The St. Albert public elementary schools have seen record-setting enrollment growth over the years. In preparation for these students accessing high school, it was decided to build a new...
Howard Grant
CIMA+ designed and developed the Howard Grant Complex, a residential building with indoor pool and gym facilities and a total surface area of 31,550 m2. Every apartment boasts high ceilings...
Saint Emilion residential project
CIMA+ designed and developed a major residential complex consisting of an 8-storey building with numerous terraces and low-slope roofs. Much of the area of the site is taken up...
Les Terrasses Francesca
Only a single stage was required for the construction of Les Terrasses Francesca: a private residential complex consisting of two buildings measuring 6 and 15 storeys. The two structures...
New youth custody facility
Development of a new youth custody centre comprised of twelve cells, a lounge, a fenced ward, confinement rooms, a gymnasium, two classrooms and other support facilities, all in compliance...
Contact our team!
- By submitting this form, I agree to receive CIMA+’s email communications regarding news, updates and products.
- You may unsubscribe at any time. Please allow 10 business days to be removed from our mailing list.
- Please refer to our Privacy Policy on our website for more details.