Circuit Breaker replacement, P&C design testing and Commissioning

Reconstruction of six furnaces at the Rio Tinto Fer et Titane (RTFT) plant, during an extended shutdown.

In the framework of this large-scale project, CIMA+ carried out the design, construction coordination, factory and on-site testing, preoperational verification, and commissioning of the furnace control and protection system. Engineering and work execution needed to be planned in light of a multidisciplinary context and a very restrictive work sequence.

The electrical commissioning of the furnaces went exactly as planned, on budget and on schedule.

<