Redevelopment of network architecture

Optimizing underground sectioning equipment

Carried out in the Gatineau area, the project involved reviewing the network architecture, while optimizing the underground sectioning equipment in order to reduce their number. The architecture of the network providing power to this sector no longer met current operating standards. CIMA+’s role was to review the network architecture and carry out civil and underground electrical engineering for network upgrades, removal of surplus equipment, optimization of remaining equipment, and the addition of a line originating from a substation.

<